Journal - Stability study of rock slope in fractured quartzite at right side of spillway, Middle Marsyangdi Hydroelectric Project, Nepal

Stability study of rock slope in fractured quartzite at right side of spillway, Middle Marsyangdi Hydroelectric Project, Nepal

Kaustubh Mani Nepal

1NEA, Middle Marsyangdi Hydroelectric Project, Nepal

Roger Olsson

2Statkraft Grøner, Lysaker, Norway

Jour. Nepal Geol. Soc., 2003, Vol. 28, 77–83


Abstract

A 120 m long and 68 m high rock cut slope is designed at the right side of spillway of Middle Marsyangdi Hydroelectric Project. This paper describes the stability studies performed for the rock cut slopes in jointed quartzite for foundation of spillway.

Member Login
NEWS AND EVENTS
  • May
    21

    Nepal Geological Society has organized a press meeting on the memory of 2015 Gorkha Earthquake on 2075/1/12 at the conference hall of Department of Irrigation, Jawalakhel

  • Feb
    06

    Nepal Geological Society organized a one day workshop on Earthquake Safety Day-2074 in 2074/10/13 at the conference hall of the United World Trade Center, Tripureshwor, Kathmandu, Nepal in association with Private and Boarding School Association Nepal (BAPSON Kathmandu Province).

Activities and Information

Activities of 17th and 18th Executive Committee
Nepal Geological Society
P.O.Box No. 231
Kathmandu, Nepal
FREEPHONE: +977-01-4437874
Email: info@ngs.org.np