Journal - Stability study of rock slope in fractured quartzite at right side of spillway, Middle Marsyangdi Hydroelectric Project, Nepal

Stability study of rock slope in fractured quartzite at right side of spillway, Middle Marsyangdi Hydroelectric Project, Nepal

Kaustubh Mani Nepal

1NEA, Middle Marsyangdi Hydroelectric Project, Nepal

Roger Olsson

2Statkraft Grøner, Lysaker, Norway

Jour. Nepal Geol. Soc., 2003, Vol. 28, 77–83


Abstract

A 120 m long and 68 m high rock cut slope is designed at the right side of spillway of Middle Marsyangdi Hydroelectric Project. This paper describes the stability studies performed for the rock cut slopes in jointed quartzite for foundation of spillway.

Member Login
NEWS AND EVENTS
  • Jul
    08

    Academic and professional development Sub Committee of the Nepal Geological Society and Nepal Geological Students’ Society in collaboration with Central Department of Geology has organized a training and interaction program entitled “Mining and Engineering Geology in field” on 23rd  Asadh 2075 at the conference hall of the Central Department of Geology, Kirtipur.

  • May
    21

    Nepal Geological Society has organized a press meeting on the memory of 2015 Gorkha Earthquake on 2075/1/12 at the conference hall of Department of Irrigation, Jawalakhel

Activities and Information

Activities of 17th and 18th Executive Committee
Nepal Geological Society
P.O.Box No. 231
Kathmandu, Nepal
FREEPHONE: +977-01-4437874
Email: info@ngs.org.np